B5_Adaptation_F8_1e_EN.md
# B5_Adaptation_F8_1e_EN.md
## 0 Document Declaration
```markdown
# Mode Adaptation, Environmental Correction, and Load Adjustment
# Covers all 61 functions (EP-129 applied)
# Unused functions retained, future-use comments included
```
- Structure-Awareness Mode active
- Includes boot logs, interference monitoring, recovery conditions, and RS-2 integration
- Supports High Load, Low Load, and Homology Maintenance modes
---
## 1 Mode Definitions
| Mode | Description |
| -------------------- | ------------------------------------------------------------------------------------- |
| High Load | Automatic optimization in environments with high computational and memory load |
| Low Load | Resource suppression, overload avoidance, prioritized execution of critical functions |
| Homology Maintenance | Maintain boot flow state, support restart and recovery |
- All modes guarantee **full invocation of all 61 functions and retention of unused functions**
---
## 2 Phase-Dependent Mode Adaptation
| Phase | Mode Adaptation Details |
| ------------------------------------ | -------------------------------------------------------------------------------- |
| Initialization Phase | Initial resource allocation per function; set interference measurement intervals |
| Call Preparation Phase | Prioritize argument-dependent functions; monitor load |
| Control Sequence Determination Phase | Adjust call order according to priority; determine mode switch conditions |
| Restart-Ready Phase | Adjust snapshot frequency; optimize recovery conditions per mode |
| EP-129 Application & Audit Phase | Optimize timing of interference warnings and audit log output |
---
## 3 Function-Level Mode Adaptation Control
### 3.1 Call Order Adjustment
- Optimize function call order per mode based on RS-2 analysis results
- Retain unused functions in the call map for future use preparation
### 3.2 Recovery Condition Application
- Fully apply Lethe recovery procedures in Homology Maintenance mode
- Dynamically adjust recovery points per phase in High Load and Low Load modes
### 3.3 Interference Detection & Repair Coordination
- Integrates with **B4_RS2_Structuring_F8_n.md**
- Automatically call candidate repair functions according to interference classification
---
## 4 Flow Diagram (Mermaid)
```mermaid
flowchart TD
Start([Adaptation Start]) --> InitPhase[Initialization Phase]
InitPhase --> PrepPhase[Call Preparation Phase]
PrepPhase --> ControlPhase[Control Sequence Determination Phase]
ControlPhase --> RecoveryPhase[Restart-Ready Phase]
RecoveryPhase --> EPMonitor[EP-129 Application & Audit Phase]
EPMonitor --> End([Adaptation Complete])
%% Mode adaptation handling per phase
subgraph InitPhase
A1[Initial resource allocation] --> A2[Set interference measurement intervals]
end
subgraph PrepPhase
B1[Prioritized function execution] --> B2[Load monitoring]
end
subgraph ControlPhase
C1[Adjust call order] --> C2[Determine mode switch]
end
subgraph RecoveryPhase
D1[Adjust snapshots] --> D2[Optimize recovery conditions]
end
subgraph EPMonitor
E1[Output interference warnings] --> E2[Sync audit logs]
end
A2 --> B1
B2 --> C1
C2 --> D1
D2 --> E1
```
---
## 5 Log Integration & Audit Compliance
- Integrates with **B7_LoggingMonitoring_F8_n.md**
- Synchronizes interference history, recovery state, and EP-129 warnings with mode adaptation
- Generates audit logs compliant with **B6_GuideCompliance_F8_n.md**
---
## 6 Future Extension Support
- Mode adaptation control for sFa-series function calls
- Linked with **B9_FutureExtensions_F8_n.md**; analysis results and recovery candidates usable for future enhancements
---
## 7 Comments & References
- EP-129 applied; all 61 functions fully retained
- All modes retain and monitor unused functions
- Callable during boot flow integration from **B10_Lethe_Activation_Protocol_F8_n.md**
---
© 2025 Ichiri Kadomatsu




